Confirm available production capacity from the exact gear, not from a generic factory figure. The part mix, machining and heat-treatment route, finishing, quantity, inspection package, packaging needs and requested delivery window can all change the usable schedule. Share those inputs early, then ask for a project-specific capacity and milestone confirmation before treating a slot as available.


PairGears’ published production-capacity FAQ notes that actual output depends on part mix, process route, bottleneck operations and inspection scope.
A capacity request for a hardened gear batch can include the drawing revision, quantity by month, machining and finishing route, required reports, packing standard and desired shipment date. PairGears can then assess the documented route and identify whether a capacity slot is supportable; no schedule should be assumed until that review is confirmed.